Being Honest
About where Australia’s
energy comes from.
Fees effective 1 July 2025
Description | Fee $ |
---|---|
Credit card fees (inc AMEX) | 0 |
Exit fee | 0 |
Fee for sending paper bills | 0 |
Fees effective 1 July 2025
Ausgrid | Fee (Inc. GST) $ |
---|---|
Move In (Power On) | 16.50 |
Move Out (Final Read) | 16.50 |
Reconnection (Power Off-Re-energisation Required) | 118.16 |
After Hours Reconnection | 162.73 |
Disconnection | 231.79 |
Vacant Site | 59.17 |
Special Read | 16.50 |
Wasted Visit | 16.50 |
Essential | Fee (Inc. GST) $ |
---|---|
Move In (Power On) | 41.34 |
Move Out (Final Read) | 41.34 |
Reconnection (Power Off-Re-energisation Required) | 88.51 |
Disconnection | 96.98 |
After Hours Reconnection | 224.04 |
Special Read | 41.34 |
Wasted Visit | 41.34 |
Endeavour | Fee (Inc. GST) $ |
---|---|
Move In (Power On) | 63.69 |
Move Out (Final Read) | 63.69 |
Reconnection (Power Off-Re-energisation Required) | 126.29 |
Disconnection | 126.29 |
After Hours Reconnection | 357.81 |
Special meter Read | 53.90 |
Wasted Visit - No Access | 273.89 |
Fees effective 1 July 2025
Jemena (Gas) | Fee (Inc. GST) $ |
---|---|
Special Read - Move in | 18.70 |
Special Read - Move out | 18.70 |
Reconnection | 129.80 |
Disconnection | 92.40 |
Wasted Visit - Reconnection | 129.80 |
Wasted Visit - Disconnection | 50.60 |
Wasted Visit - Special Read | 18.70 |
Ausgrid | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Allocate NMI | 78.71 | - |
Temporary Isolation Group Metering - Initial site visit - no access | 203.97 | - |
Temporary Isolation Group Metering - Simple (up to nine) complete - excluding initial site visit | 364.97 | - |
Temporary Isolation Group Metering - no access 2nd visit | 566.75 | - |
Temporary Isolation Group Metering - Complex (more than nine) | 802.01 | - |
Endeavour Energy | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Allocate NMI - Per NMI | 44.58 | - |
New Connection - Unsuccessful NMI allocation | 11.15 | - |
Temporary Isolation Group Metering - Initial site visit - no access | 273.89 | - |
Temporary Isolation Group Metering - Notification Only - Initial Assessment | 420.66 | - |
Temporary Isolation Group Metering - Completed | 812.08 | - |
Temporary Isolation Group Metering - Unable To Complete | 567.44 | - |
Essential Energy | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Allocate NMI | 102.75 | - |
Temporary Isolation Group Metering - Initial Visit | 579.84 | - |
Temporary Isolation Group Metering - Late Cancellation | 662.86 | - |
Temporary Isolation Group Metering - Initial Visit (Overtime) | 772.35 | - |
Temporary Isolation Group Metering - Isolation Complete (Normal Time) | 496.84 | - |
Temporary Isolation Group Metering - Isolation Complete (Overtime) | 675.59 | - |
Temporary Isolation Group Metering - Early Cancellation | 67.42 | - |
Meter Provider | Service description | Fee (incl GST) $ |
---|---|---|
All Meter Providers | Wasted site visit - this fee is applied when the technician is unable to complete the work due to a site issue or safety concerns (e.g. no access to the meter, meter board issues, meter tamper identified). | Up to $200. Fees vary depending on the Meter Provider and the work that was requested. |
Jemena | Business Hours Fee (inc GST) $ |
---|---|
Alteration - New Gas Connection (standard connection - The connection type is confirmed by the distributor) | No Charge |
Alteration - New Gas Connection (non-standard connection - The connection type is confirmed by the distributor) | Costs are quoted by the distributor, subject to site inspection |
Alteration - New Gas Connection (commercial) | Costs are quoted by the distributor, subject to site inspection |
Abolishment - Gas service abolishment (removal of service line and meter) | 1320.66 |
Abolishment - Gas meter removal only | 92.40 |
Alteration - Alter Meter Position | Quoted |
Alteration - Meter Refix | Quoted |
Alteration - Service Upgrade | Quoted |
Fees effective 1 July 2025
Description | Fee $ |
---|---|
Credit card fees (inc AMEX) | 0 |
Exit fee | 0 |
Fee for sending paper bills | 0 |
Fees effective 1 July 2025
SAPN | Fee (incl GST) $ |
---|---|
Move In (Power On) | 21.23 |
Move Out (Final Read) | 21.23 |
Reconnection (Power Off-Re-energisation Required) | 63.71 |
Disconnection | 63.71 |
After Hours Reconnection | 142.63 |
Special Read | 21.23 |
Wasted Visit | Quoted |
Fees effective 1 July 2025
AGN SA (Gas) | Fee (incl GST) $ |
---|---|
Special Read - Move in | 14.52 |
Special Read - Move out | 14.52 |
Reconnection | 99.00 |
Disconnection | 99.00 |
Wasted Visit - No Access | 81.40 |
SA Power Network | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection | SA Power Network bills the customer directly for the work to be completed. If they do not, SA Power Network will pass on the fee to the Retailer and we will pass on these fees to the customer on their bill. | - |
Alteration - Temporary Disconnect and Reconnect for Retailer | 1269.92 | - |
Alteration - Temporary Disconnect and Reconnect for Retailer - After hours | 142.63 | - |
Abolishment | 898.205 SA Power Network bills the customer directly for the work to be completed. If they do not, SA Power Network will pass on the fee to the Retailer and we will pass on these fees to the customer on their bill. | - |
Meter Provider | Service description | Fee (incl GST) $ |
---|---|---|
All Meter Providers | Wasted site visit - this fee is applied when the technician is unable to complete the work due to a site issue or safety concerns (e.g. no access to the meter, meter board issues, meter tamper identified). | Up to $200. Fees vary depending on the Meter Provider and the work that was requested. |
Australian Gas Network (AGN) | Business Hours Fee (inc GST) $ |
---|---|
Alteration - Alter Meter Position - Quote not accepted | 140.80 |
Alteration - Alter Meter Position | Quoted |
New Gas Connection - Meter Fix - Fault Rectified | 107.80 |
Alteration - Meter Refix | 107.80 |
New Gas Connection - Incomplete Meter Fix | 81.40 |
Alteration - Upgrade Service line | Quoted |
Alteration - Upgrade/downgrade meter size | Quoted |
Abolishment - Gas meter removal only | 99.00 |
Abolishment - Gas service abolishment (removal of service line and meter) | Quoted |
Fees effective 1 July 2025
Description | Fee $ |
---|---|
Credit card fees (inc AMEX) | 0 |
Exit fee | 0 |
Fee for sending paper bills | 0 |
Fees effective 1 July 2025
Energex | Fee (inc GST) $ |
---|---|
Move In (Power On) | 0.00 |
Move Out (Final Read) | 0.00 |
Reconnection (Power Off-Re-energisation Required) | 0.00 |
Disconnection | 0.00 |
After Hours Reconnection | 153.82 |
Special Read | 22.20 |
Wasted Visit | 157.77 |
Fees effective 1 July 2025
AGN Qld (Gas) | Fee (incl GST) $ |
---|---|
Special Read - Move in | 13.20 |
Special Red - Move out | 13.20 |
Reconnection | 80.30 |
Disconnection | 97.90 |
Wasted Visit - No Access | 81.40 |
Allgas (Gas) | Fee (incl GST) $ |
---|---|
Special Read - Move in | 26.08 |
Special Read - Move out | 26.08 |
Reconnection | 91.71 |
Disconnection | 71.64 |
Wasted Visit - Meter Services | 26.07 |
Wasted Visit - Field Services | 149.57 |
Energex | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection Permanent | No Fee in most cases. Energex may charge a fee dependent on the type of connection. In this case, these fees will be passed to the customer on their bill. | - |
New Connection - Temporary | 577.86 | 1561.97 |
New Connection - Temporary - CT | 577.86 | 2594.68 |
Abolishment | 113.50 - 1989.24 Prices vary depending on the work Energex are required to carry out and if traffic control is required | - |
Alteration - All Alterations | 113.00 - 3000.00 depending on what work is required. There will be additional charges if traffic control is required. | - |
Meter Provider | Service description | Fee (incl GST) $ |
---|---|---|
All Meter Providers | Wasted site visit - this fee is applied when the technician is unable to complete the work due to a site issue or safety concerns (e.g. no access to the meter, meter board issues, meter tamper identified). | Up to $200. Fees vary depending on the Meter Provider and the work that was requested. |
Australian Gas Network (AGN) | Business Hours Fee (inc GST) $ |
---|---|
New Gas Connection - Meter Fix - Fault Rectified | 106.70 |
New Gas Connection - Meter Fix - Incomplete | 81.40 |
Alteration - Alter Meter Position | Quoted |
Alteration - Alter Meter Position - Quote not accepted | 97.90 |
Alteration - Meter Refix | 106.70 |
Alteration - Service Upgrade | Quoted |
Alteration - Meter Upgrade/Meter downgrade | Quoted |
Alteration - Relocate Service | Quoted |
Alteration - Meter Alter Position | Quoted |
Abolishment - Gas meter removal only | 97.90 |
Abolishment - Gas service abolishment (removal of service line and meter) | Quoted |
Allgas | Business Hours Fee (inc GST) $ |
---|---|
New Gas Connection - Meter Fix - Fault Rectified | 91.71 |
Alteration - Alter Meter Position | Quoted |
Alteration - Meter Refix | 91.71 |
Alteration - Service Upgrade | Quoted |
Alteration - Meter Upgrade/Meter downgrade | Quoted |
Alteration - Relocate Service | Quoted |
Abolishment - Gas meter removal only | 71.64 |
Abolishment - Gas service abolishment (removal of service line and meter) | Quoted |
Fees effective 1 July 2025
Description | Fee $ |
---|---|
Credit card fees (inc AMEX) | 0 |
Exit fee | 0 |
Fee for sending paper bills | 0 |
Fees effective 1 July 2025
CitiPower | Fee (inc GST) $ |
---|---|
De-Energisation (Physical) - Business Hours | 49.32 |
Re-Energisation (Physical) - Business Hours | 48.60 |
De-Energisation (Remote) | 0.00 |
Re-Energisation (Remote) | 0.00 |
Special Read (Final Read/No Subtype) | 39.95 |
Wasted Visit | 39.95 |
Jemena | Fee (inc GST) $ |
---|---|
De-Energisation (Physical) - Business Hours | 95.65 |
De-Energisation (Physical) - After Hours | 95.65 |
Re-Energisation (Physical) - Business Hours | 66.69 |
Re-Energisation (Physical) - After Hours | 116.42 |
De-Energisation (Remote) | 0.00 |
Re-Energisation (Remote) | 0.00 |
Special Read (Final Read/No Subtype) | 64.27 |
Wasted Visit | Same as original service charge |
Ausnet | Fee (inc GST) $ |
---|---|
De-Energisation (Physical) - Business Hours | 46.89 |
De-Energisation (Physical) - After Hours | 82.07 |
Re-Energisation (Physical) - Business Hours | 46.89 |
Re-Energisation (Physical) - After Hours | 82.07 |
De-Energisation (Remote) | 0.00 |
Re-Energisation (Remote) | 0.00 |
Special Read (Final Read/No Subtype) | 46.89 |
Wasted Visit | 82.07 |
Powercor | Fee (inc GST) $ |
---|---|
De-Energisation (Physical) - Business Hours | 76.53 |
Re-Energisation (Physical) - Business Hours | 72.01 |
De-Energisation (Remote) | 0.00 |
Re-Energisation (Remote) | 0.00 |
Special Read (Final Read/No Subtype) | 63.21 |
Wasted Visit | 63.21 |
United | Fee (inc GST) $ |
---|---|
De-Energisation (Physical) - Business Hours | 67.45 |
Re-Energisation (Physical) - Business Hours | 67.45 |
De-Energisation (Remote) | 0.00 |
Re-Energisation (Remote) | 0.00 |
Special Read (Final Read/No Subtype) | 31.68 |
Wasted Visit | 31.68 |
Fees effective 1 July 2025
Ausnet | Fee (inc GST) $ |
---|---|
Disconnection | 75.02 |
Reconnection | 75.02 |
Special Read - Move In/Out | 8.18 |
Special Read - Disconnection | 8.18 |
AGN | Fee (inc GST) $ |
---|---|
Disconnection | 94.60 |
Reconnection | 110.00 |
Special Read - Move In/Out (Metro) | 12.10 |
Special Read - Move In/Out (Non-Metro) | 16.72 |
Wasted Visit - No Access | 91.30 |
Multinet | Fee (inc GST) $ |
---|---|
Disconnection | 68.20 |
Reconnection | 57.20 |
Special Read - Move In/Out | 8.80 |
Ausnet | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Single Phase Overhead Supply | 671.51 | 1175.15 |
New Connection - Single Phase Underground Supply | 295.11 | 516.45 |
New Connection - Multi Phase Overhead Supply | 763.13 | 1335.47 |
New Connection - Multi Phase Underground Supply | 467.72 | 1761.52 |
New Connection - Multi Phase Overhead Supply - CT Meter | 1456.97 | 2455.35 |
New Connection - Multi Phase Underground Connection - CT Meter | 1161.57 | 2032.73 |
New Connection - Temporary Overhead Supply, Coincident Disconnection Truck Visit | 665.79 | 1165.13 |
New Connection - Single Phase with Group Metering Inspection | 636.31 | 636.31 |
New Connection - Multi Phase with Group Metering Inspection | 814.64 | 814.64 |
Alteration - Service Truck | 764.57 | Quoted |
Other - Wasted Truck Visit | 284.36 | 284.36 |
Solar Alteration - Meter Reconfiguration | 20.36 | - |
Abolishment | Quoted | Quoted |
Citipower | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Single Phase Supply | 684.38 | 826.40 |
New Connection - Multi Phase Supply | 817.97 | 972.10 |
New Connection - Multi Phase Supply - CT Meter | 3420.77 | 4591.57 |
Alteration - Standard alteration <60 min When multiple services of standard alteration are required, it is deemed as complex alteration | 744.23 | 1036.31 |
Alteration - Complex alteration >60 min | 925.00 | 1288.05 |
Alteration - Isolation of supply or reconnection | 430.67 | 599.70 |
Alteration - Isolation of supply and reconnection after isolation - same day | 792.34 | - |
Solar alteration - Remote Meter Reconfiguration | 74.28 | - |
Other - Wasted Truck Visit (Complex task) | 463.73 | 584.11 |
Other - Wasted Truck Visit (Simple task) | 39.95 | 584.11 |
Abolishment | Quoted | Quoted |
Jemena | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Single Phase Supply | 759.96 | 1006.51 |
New Connection - Multi Phase Supply | 934.96 | 1181.53 |
New Connection - Single Phase - Temporary Supply | 759.96 | 1006.51 |
New Connection - Multi Phase - Temporary Supply | 934.96 | 1181.53 |
Alteration - Disconnection (temporary) requiring a service vehicle | 494.58 | 700.07 |
Alteration - Reconnection requiring a service vehicle | 573.03 | 815.90 |
Alteration - Basic connection upgrade (single-phase to three-phase) | 934.96 | 1181.53 |
Alteration - Replacement of overhead basic connection (single-phase) | 911.42 | 1157.97 |
Alteration - Replacement of overhead basic connection (three-phase) | 1011.56 | 1258.13 |
Alteration - Meter alteration (or relocation) | 636.10 | 878.94 |
Other - Wasted Truck Visit | 636.10 | 878.94 |
Solar Alteration - Remote Meter Reconfiguration | 67.25 | - |
Abolishment | Quoted | Quoted |
Powercor | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Single Phase Supply | 688.71 | 838.35 |
New Connection - Multi Phase Supply | 852.96 | 1016.72 |
New Connection - Multi Phase Supply - CT Meter | 3339.67 | 4498.70 |
Abolishment | Quoted | Quoted |
Alteration - Standard alteration <60 min When multiple services of standard alteration are required, it is deemed as complex alteration | 864.90 | 1195.46 |
Alteration - Complex alteration >60 min | 1074.96 | 1485.86 |
Alteration - Isolation of supply or reconnection | 500.50 | 691.81 |
Alteration - Isolation of supply and reconnection after isolation - same day | 920.82 | - |
Other - Wasted Truck Visit (Complex task) | 472.90 | 593.47 |
Other - Wasted Truck Visit (Simple task) | 63.21 | 593.47 |
Solar alteration - Remote Meter Reconfiguration | 74.93 | - |
United Energy | Business Hours Fee (inc GST) $ | After Hours Fee (inc GST) $ |
---|---|---|
New Connection - Single Phase Supply | 681.14 | 1066.14 |
New Connection - Multi Phase Supply | 681.14 | 1066.14 |
New Connection - Multi Phase Supply - CT | 2364.32 | 3700.71 |
Abolishment | Quoted | Quoted |
Alteration - Standard alteration <60 min When multiple services of standard alteration are required, it is deemed as complex alteration | 747.75 | 1308.58 |
Alteration - Complex alteration > 60 min | 929.39 | 1626.43 |
Alteration - Isolation of supply or reconnection | 432.73 | 757.26 |
Alteration - Isolation of supply and reconnection after isolation - same day | 796.11 | - |
Other - Wasted Truck Visit (Complex task) | 419.74 | 734.54 |
Other - Wasted Truck Visit (Simple task) | 31.68 | 734.54 |
Solar alteration - Remote Meter Reconfiguration | 89.93 | - |
Australian Gas Network (AGN) | Business Hours Fee (inc GST) $ |
---|---|
New Gas Connection (standard connection - The connection type is confirmed by the distributor) | 1738.00 |
New Gas Connection (non-standard connection - The connection type is confirmed by the distributor) | Costs are quoted by the distributor, subject to site inspection |
New Gas Connection (commercial) | Costs are quoted by the distributor, subject to site inspection |
New Gas Connection - Incomplete Meter Fix | 121.00 |
New Gas Connection - Meter Fix - Fault Rectified | 135.30 |
Alteration - Alter Meter Position | Quoted |
Alteration - Alter Meter Position - Quote not accepted | 99.00 |
Alteration- Meter Refix | 135.30 |
Alteration - Relocate service line | Quoted |
Alteration - Upgrade/downgrade meter size | Quoted |
Alteration - Upgrade service request | Quoted |
Alteration - Pressure change request | Quoted |
Abolishment - Gas meter removal only | 135.30 |
Abolishment - Gas service abolishment - Residential (removal of service line and meter) | 258.50 |
Multinet | Business Hours Fee (inc GST) $ |
---|---|
New Gas Connection (standard connection - The connection type is confirmed by the distributor) | 2072.40 |
New Gas Connection (non-standard connection - The connection type is confirmed by the distributor) | Costs are quoted by the distributor, subject to site inspection |
New Gas Connection (commercial) | Costs are quoted by the distributor, subject to site inspection |
Alteration - Alter Meter Position | Quoted |
Alteration - Service Upgrade | Quoted |
Alteration - Regulator Upgrade | 143.00 |
Alteration - Meter Upgrade | 143.00 |
Alteration - Meter Upgrade/Regulator upgrade (Gippsland) | 190.30 |
Alteration - Meter refix | 82.50 |
Abolishment - Meter Removal | 82.50 |
Alteration - Gas service abolishment- Residential (removal of service line and meter) | 258.50 |
Ausnet Services | Business Hours Fee (inc GST) $ |
---|---|
New Gas Connection (standard connection - The connection type is confirmed by the distributor) | 2156.00 |
New Gas Connection (non-standard connection - The connection type is confirmed by the distributor) | Costs are quoted by the distributor, subject to site inspection |
New Gas Connection (commercial) | Costs are quoted by the distributor, subject to site inspection |
Alteration - Meter Refix | 165.33 |
Alteration - Meter Alter Position (Minor) | 1174.20 |
Alteration - Upgrade Meter Size | 581.91 (U10) 2,471.57 (AL 425) |
Abolishment - Gas service abolishment - Residential (removal of service line and meter) | 257.91 |